An Analysis on the First-Stage Diversion Construction Method of the Dam of the Congo (ZO) ZONGO II Hydropower Station

Journal: Region - Water Conservancy DOI: 10.32629/rwc.v1i2.72

Xifeng Liu

China Water Resources and Hydropower First Engineering Bureau Co., Ltd.

Abstract

The dam of the ZONGOII hydropower station in the Congo is located 800m downstream of the tail water outlet of the ZONGOⅠplant. The first phase of the diversion of the dam is carried out by installing a cofferdam on the left bank of the Inkisi River to carry out sand sluice and other projects. Due to the feasibility of the construction plan and the reasonable organization of the on-site personnel, the first phase of the diversion task was successfully completed.

Keywords

phase I diversion; cofferdam; right bank expansion; embankment standard

Funding

China Water Resources and Hydropower First Engineering Bureau Co., Ltd., China

References

[1] (2018) Busanga hydropower Station in Congo (Jin) Achieves River Closure. Yunnan Hydropower, 34 (05): 178.
[2] Li Bingrong. (2014) Analysis of Construction Diversion Scheme Selection of Luojiadian Hydropower Station. Heilongjiang Hydraulic Engineering, 42 (01): 86-87.
[3] Wang Wei, Guo Hong, Zheng Guowei. (2014) Modification and Optimization of Construction Diversion Scheme for Dam Construction of NEELUM JHELUM Hydropower Project. Water Resources and Hydropower Engineering Design, 33 (04): 6-8.

Copyright © 2019 Xifeng Liu

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License