Congo (Kingdom) ZONGOII Hydropower Project First Valve Room Stability Technical Report

Journal: Journal of Building Technology DOI: 10.32629/jbt.v1i1.61

Xue Li

China Water Resources and Hydropower First Engineering Bureau Co., Ltd.

Abstract

ZONGOII hydropower station is a diversion-type power station constructed in Congo (Kinshasa), which uses Chinese funds and Chinese standards. However, during the implementation of the project, Gangfang Electric Power Company referred to the design form of the completed hydropower station and instructed me Fang added a first valve chamber at the end of the flat section of the pressure pipeline after the surge well, so that the technicians of the rigid side can use the familiar maintenance practices to perform maintenance and maintenance of the power plant units and butterfly valves. The purpose of this paper is to demonstrate the stability analysis of the additional valve room project based on the requirements of Chinese standards and the needs of rigid owners.

Keywords

ZONGOII hydropower station; valve room engineering; stability analysis

Funding

China Water Resources and Hydropower First Engineering Bureau Co., Ltd., China

References

[1] Zhang Weiju. (2011) Selection and Design of Hydro-generator Units for ZONGOⅡ Hydropower Station in Congo. Value Engineering, 30 (36): 19.
[2] Zhou Jiangtao. (2012) Research on Capacity Expansion and Model Selection of Congo (Kim) Bandera Hydropower Station. China Science and Technology Information, (21): 54+70.
[3] Zhang Xiuwen, Gong Chuanli, Yao Weida, et al. (2010) AVC function and implementation of Congo's Yingbulu Hydropower Station. Hydromechanical Engineering, 33 (03): 105-106.

Copyright © 2019 Xue Li

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License