The Relationship between Pre-Estimation and Cost Management in Industrial Construction Projects

Journal: Architecture Engineering and Science DOI: 10.32629/aes.v5i1.1847

Jianxiang Yang

The Sixth Engineering Company of CCCC Fourth Harbor Engineering Co., Ltd., Zhuhai, Guangdong, China

Abstract

Industrial construction projects are the foundation of organizing industrial production, requiring both quality assurance and cost considerations. Pre-estimation of project costs and cost management are essential means and methods for project cost management. Strengthening the pre-estimation management of construction project costs can effectively control project costs and quality, save funds, and provide data support for management decisions. This article first briefly introduces the concepts of pre-estimation and cost management in engineering costs, focusing on the relationship between pre-estimation and cost management in industrial construction projects. It then proposes countermeasures from the aspects of enhancing the scientificity and accuracy of pre-estimation compilation and strengthening fine management on the construction site, aiming to provide some reference for the industry.

Keywords

engineering cost pre-estimation, cost management, relationship analysis, countermeasure proposals

References

[1] Zhu Yinhé, Feng Changgeng. Analysis of the Relationship between Pre-Estimation of Construction Costs and Construction Cost Management[J]. China Building Decoration and Decoration, 2023, (10): 141-143.
[2] Zhao Weichao. Analysis of the Relationship between Pre-Estimation of Construction Costs and Construction Cost Management[C]//China Smart City Economic Expert Committee. Proceedings of the Shenzhen Sub-Forum of the 2023 Smart City Construction Forum. China Communications Property Services Group Co., Ltd., 2023: 2. DOI: 10.26914/c.cnkihy.2023.027196.
[3] Gao Bo, Wang Qianqian. The Relationship between Pre-Estimation of Construction Costs and Construction Cost Management in Industrial Construction Projects[J]. Construction and Budget, 2021, (06): 35-37. DOI: 10.13993/j.cnki.jzyys.2021.06.011.
[4] Wang Peng, Bian Xiaohan. Analysis of Cost Control Measures for Factory Building Projects—Taking Factory Building 9# of Zhenglin Whole House Customization Industrial Park as an Example[J]. Fujian Building Materials, 2021, (02): 111-113.
[5] Li Yuedong. Analysis of Engineering Cost Control in Industrial Building Structural Design[J]. Chemical Industry Management, 2019, (22): 184.

Copyright © 2024 Jianxiang Yang

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License